Commercial Office Renovation in Metro Atlanta

The problem

You are reconfiguring a floor that people still work on, or turning over a suite between tenants with a hard move-in date. Either way you need the work sequenced so it does not shut down the business, and priced so you can defend it to ownership.

What's included

Real scope, trade by trade

  • Space planning coordination and demolition
  • Framing, drywall, and acoustic partitions
  • Ceilings, lighting, and electrical distribution
  • HVAC zoning and controls
  • Glass fronts, doors, and hardware
  • Flooring and wall finishes
  • Break rooms and restroom upgrades
  • Phased work around occupied areas
How it works

We scope the phasing before the price so there are no surprises.

1

Walk the space

We come out and look at what’s actually there — existing conditions, the capacity of the HVAC, electrical, and plumbing, and what your use will trigger for code and accessibility. Bring whatever you have: drawings, the lease exhibit, your target date. It takes about an hour, and we get on the calendar within days.

2

Get a real number

We scope it trade by trade — not a per-foot guess — and account for permitting and the long-lead items that actually move a schedule. You get a scoped estimate with the inclusions and exclusions spelled out, so you can hand it to your owner or lender and defend it. Not a range, and usually back in days.

3

We build

We pull the permits, order the long-lead items, and mobilize — self-performing the interior trades and managing the rest, in sequence. You get a point of contact and updates at the milestones that matter, through punch and closeout, including the documents you need to occupy.

See how a job runs day to day →
Typical range
$60K–$400K
Typical timeline
6–14 weeks depending on phasing

Common questions

Can you renovate while we stay in the space?
Usually, yes. We phase the work around occupied areas and sequence the disruptive trades for off-hours where it matters. We scope the phasing before we price it so the plan is realistic.
What does an office renovation typically cost?
Most office renovations we do fall in the $60K–$400K range, driven mostly by how much of the HVAC, electrical, and layout changes. A site walk produces a real number for your floor.
How long will it take?
Typically six to fourteen weeks depending on phasing and scope. Working around an occupied floor adds time but avoids shutting down the business.

Got a space that needs work?

Call us. We'll come walk it and tell you what we think it'll take.